Skriv ut frågornaSkriv ut fågorna Skriv ut frågorna med facitSkriv ut (med facit)

Quiz Network+ N10-006 Blandat

21 st förberedande frågor för Network+ certifiering N10-006 blandade frågor.

A network technician replaced a faulty Ethernet cable. The technician replaced one side of the patch in the incorrect part ofthe patch panel. Within a few minutes, the technician was informed that users were experiencing slow or no Internet connectivity all over the building. A broadcast storm began. Alter removing the replacement cable, which ofthe following should the technician do NEXT?